New Eldon | Development Progress

Here you will find the latest progress reports and images for the construction of New Eldon in Liverpool, UK. The New Eldon site will be made up of the three original blocks, which are Grade II-listed, alongside three new blocks of stylish and contemporary 45 one, two & three bedroom apartments, offering the perfect balance of past and present.

The apartments are set within peaceful surroundings, yet on the edge of the vibrant Liverpool city centre, boasting a diverse mix of bars, restaurants, clubs, theatres and shopping to suit every preference. The New Eldon is investing in the community and bringing new possibilities to this proud area of the city.

Onsite features range from a community garden and shared landscaping, as well as parking, bike storage, and secured entrance hallways once complete.

This fully managed cash investment offers 7% NET assured for 2 year and has been designed by experienced and successful architects.

New Eldon | Development Progress 25/07/2019

Full structural report has now been completed on all 3 blocks, this is now being compiled into a final document to submit to Liverpool City Council.

Listed building content has been applied for block A roof to be fitted.

Ongoing submissions to the council over release of planning conditions.

Mortar samples, window samples, rain water goods samples and brick samples have all been submitted for approval.

Although no furthers work have started on the buildings, ongoing preparation of works is underway with tender packs going out for various contracts.

Weekly progress meetings and tender packs being drawn up for works to recommence.

Main schedule of works is anticipated to start within the next 8 weeks.

Download Update

New Eldon | Development Progress 17/10/2018

The building has been made safe for works and the internal strip out is complete.

The roof has now been fully removed from Block A and site cleared. Some internal apartment strip out has commenced to make ready for incoming contractors.

We are currently working through all the planning conditions with the Conservation Officer and Planning Officer from Liverpool City Council. This has taken a lot longer than expected and is due to the historic nature of the works. The council are very insistent that even the original roof tiles be reused to maintain the original features.

We are awaiting some official discharge notices where we can then return on site for continual works.

We are due to go back on to site once these conditions have been discharged. We will then be able to provide a more detailed build schedule. Please see the images below.

New Eldon | Development Progress 12/07/2018

The building has been made safe for works and the internal strip out is complete.

The roof is now being removed. As stated in the last update New Eldon is a grade II listed building and each tile will be hand stripped individually and cleaned in preparation for re-installing the new roof following construction. Please see the images below.

New Eldon | Development Progress 06/06/2018

This update about the development progress of New Eldon in Liverpool is dated from 06/06/2017. The scaffolding is now going up on New Eldon. Each block will have the scaffolding completed in 3 – 4 weeks. Once scaffolding is completed the internal strip out will commence.

After the strip out and the building is made safe, the roof will then be taken off. As New Eldon is a grade II listed building each tile will be hand stripped individually and cleaned in preparation for re-installing the new roof following construction of new joists and trusses. Once the roof and external windows have been fitted and the building is fully water tight the internal work and external brick work repairs will commence.

New Eldon | Development Progress 06/11/2017

This update about the development progress of New Eldon in Liverpool is dated from 06/11/2017. This is our first update for New Eldon. Works have been delayed slightly due to Liverpool City Council. However, you can see the latest images below from New Eldon where the diggers are onsite, clearing works started, as well as the hoarding being put up.