Quay Central | Development Progress

Here you will find the latest progress reports and images for the construction of the Quay Central in Liverpool, UK. In the heart of Albert Dock’s remarkable regeneration is our brand new residential project, Quay Central. It’s a high-specification new-build development located in a core part of Liverpool Waters’ future cultural and leisure hub – Central Docks.

Set in the most centralised location within Liverpool Waters, Central Docks will be the area’s beating heart, forming its entertainment, business and leisure hub. Quay Central will bring 108 spacious one and two bedroom apartments ideally located in the Central Docks suburb. The vibrant neighbourhood will offer impressive views of the River Mersey and create an unrivalled location and lifestyle for its residents.

With each apartment carefully designed with space in mind each of these stylish apartments will generate projected rental yields of around 6%.

Quay Central | Development Progress 20/11/2018

This update about the development progress of Quay Central in Liverpool is dated from 20/11/2017:

Progress on site at Quay Central continues at pace, with block work to the ground floor plant room, lift shafts and substation progressing well. Ground floor slab and below ground drainage works are now complete. Structural frame, metal decking, upper floors and roof slab are also all 100% complete.

The external wall panels are now complete. Window installation is well progressed on all levels and elevations. Dry lining & M&E service distribution commenced on floor 6 with first fix commenced on level 5.
Apartment fit out progressing well on level 2, including kitchens, wardrobes and bathrooms. External brickwork progressing beyond level 6 on North and East elevations, level 4 on the South and level 4 on the West elevation.

Completion is still on track for February 2019.

Download Update

Quay Central | Development Progress 31/05/2018

This update about the development progress of Quay Central in Liverpool is dated from 31/05/2017. The building is coming along nicely as you can see in the images. Note the stunning views that Quay Central will offer its residents.

Quay Central | Development Progress 22/05/2018

This update about the development progress of Quay Central in Liverpool is our very first update dated from 22/05/2018. The frame is nearly complete, concrete pouring is underway and progress is going strong. Images from the site can be seen below.

Quay Central | Liverpool

To invest in Quay Central or learn more about the development, please click the link below.

Investment Overview: Quay Central | Liverpool