Mabgate Gateway | Development Progress
Here you will find the latest progress reports and images for the construction of Mabgate Gateway in Leeds, UK. Whether you’re looking to live a cosmopolitan life in leeds City Centre or to invest in the fastest growing city in Britain, Mabgate Gateway in Leeds is the place to be.
This exciting new, high specification development of apartments in the heart of Leeds city centre has been built around core principles such as maximisation of space and the aim of being a solid investment for not just today’s needs, but the future to come.
Leeds City Council are adding another 4,500 square metres of public space as part of the £13.6 million redevelopment of West Yorkshire Playhouse and Leeds City College has plans for a new £57 million campus.
Coming with a net yield of 6.5% for first 2 years and positioned in a strategic location which is enjoying massive investment, Mabgate Gateway is an exciting prospect for any investor.
Mabgate Gateway | Development Progress 11/10/2018
This update about the development progress of Mabgate Gateway in Leeds and is dated from 11/10/2018.
- Serving notice to complete is expected towards the end of October
- Building B – frame complete, floors 1-3 are fully plastered, floors 1 and 2 are being fitted
- Floor 4 is fully boarded out
Below you can see images from the Mabgate construction site.
This update about the development progress of Mabgate Gateway in Leeds is our very first update dated from 31/08/2018.
Below you can see the report from the Mabgate construction site. The attached document includes further images from inside and outside.
Mabgate Gateway | Development Progress 18/06/2018
This update about the development progress of Mabgate Gateway in Leeds and is dated from 18/06/2018.
Construction progress of Mabgate is in advance of the target, with block A likely to complete next month, and block B estimated to complete in September. Below you can see images from the Mabgate construction site.
- Block B: The frame is complete and the fitting out is starting on the ground floors with insulation etc being fitted
- Metal deck to upper floors is 100% complete.
- Block A: Is far more progressed, the units vary in their build stage from boarded to 2nd fix.
- The rear elevation is predominantly glazed, the front elevation has the frames in place. Brick and stone facing is in place as per images.
- Units have stairs Fitted internally and the more advanced units even have laminate flooring and doors fitted (all covered and protected).
Mabgate Gateway | Development Progress 27/04/2018
This update about the development progress of Mabgate Gateway in Leeds and is dated from 27/04/2018.
Below you can see images from the Mabgate construction site and the attached report goes into more detail.
- Internal studwork to A1 – first side is 99% complete
- Metal deck to upper floors is 100% complete
- Scaffolding is 10% complete
Mabgate Gateway | Development Progress 15/01/2018
This update about the development progress of Mabgate Gateway in Leeds is our very first update dated from 15/01/2018.
Below you can see images from the Mabgate construction site. The attached document includes further images from inside.
Mabgate Gateway | Leeds
To invest in Mabgate Gateway or learn more about the development, please click the link below.