York House | Development Progress

Here you will find the latest progress reports and images for the construction of the York House in Liverpool, UK. This handsome Grade II-listed building nestled in the shadow of Liverpool ONE on the cobbled streets that make up the Ropewalks area.

It’s close to the city’s popular destinations such as Albert Dock, Echo Arena and Liverpool ONE. Public transport is extremely accessible with main train stations within a few minutes’ walk. The combination of attractions, city centre retail, nightlife and culture, as well as the close proximity to the Universities, just add to the appeal of this extremely convenient location.

Each apartment in York House will be finished to a high spec, from high speed Internet with CCTV access, contemporary designer kitchens in a choice of colours plus indulgent bathrooms, ensuring a bespoke package for the discerning client.

With York House, investors gain a projected NET income of 7% and are sure to benefit from attractive capital growth and constant demand due to the central location and boutique nature of the development.

York House | Development Progress 13/09/2018

The attached report goes into more detail about what works have been completed and how things are progressing. Important points to note are below.

Main Points: 

  • Basement apartments are close to completion.
  • Rear extension is now fully erected.
  • Both loft areas are very close to completion.
  • All repointing work is now complete and paintwork is 80% complete with just final coats still to apply.
  • Download Update

    York House | Development Progress 12/05/2018

    This update about the development progress of York House in Liverpool is our very first update dated from 12/05/2018.

    The attached report goes into more detail about what works have been completed and how things are progressing. Important points to note are below.

    Main Points: 

    • All excavation and underpinning works now complete.
    • Living areas and bedrooms to flats on 2nd and 3rd floors insulated, boarded and skimmed. Bathrooms boarded.
    • Scaffolding to be erected to 5 York Street imminently. This will allow for the removal of the rear elevation stairwell wall. It also allows us to begin loft conversion to 5 York Street.

    York House | Development Progress 22/03/2018

    Additional excavation has been completed on the basement to 5 York Street and expect to complete work to 3 York Street this coming week.

    The attached report goes into more detail about what works have been completed and how things are progressing. Important points to note are below.

    Main Points: 

    • Both gardens have been flattened and cleared. We have dug down to expose the main drain to both gardens as well as the 2 light well entrances into the basement flats
    • New Hush28 flooring system laid to rooms on ground floor, only corridors outstanding
    • All new structural steel and pad stones installed for loft floor. Loft floor installed and boarded

    York House | Development Progress 22/01/2018

    This update about the development progress of York House in Liverpool is our very first update dated from 22/01/2018. Please find the latest images from the York House construction site below.

    York House | Liverpool

    To invest in York House or learn more about the development, please click the link below.

    Investment Overview: York House | Liverpool

    Development Enquiry Form